This is going to be very painful and difficult for a number of DOCSIS3
operators, including some of the largest ISPs in the USA with
multi-millions of subscribers with tons of legacy coax plant that have no
intention of ever changing the RF channel setup and downstream/upstream
asymmetric bandwidth allocation to provide more than 15-20Mbps upstream per
home.





On Thu, 26 May 2022 at 16:59, Jeff Shultz <jeffshultz () sctcweb com> wrote:

I think we have a winner here - we don't necessarily need 1G down, but we
do need to get the upload speeds up to symmetrical 50/50, 100/100 etc...
there are enough people putting in HD security cameras and the like that
upstream speeds are beginning to be an issue.

On Tue, May 24, 2022 at 4:37 AM David Bass <davidbass570 () gmail com> wrote:

The real problem most users experience isn’t that they have a gig, or
even 100Mb of available download bandwidth…it’s that they infrequently are
able to use that full bandwidth due to massive over subscription .

The other issue is the minimal upload speed.  It’s fairly easy to consume
the 10Mb that you’re typically getting as a residential customer.  Even
“business class” broadband service has a pretty poor upload bandwidth
limit.

We are a pretty high usage family, and 100/10 has been adequate, but
there’s been times when we are pegged at the 10 Mb upload limit, and we
start to see issues.

I’d say 25/5 is a minimum for a single person.

Would 1 gig be nice…yeah as long as the upload speed is dramatically
increased as part of that.  We would rarely use it, but that would likely
be sufficient for a long time.  I wouldn’t pay for the extra at this point
though.

On Mon, May 23, 2022 at 8:20 PM Sean Donelan <sean () donelan com> wrote:


Remember, this rulemaking is for 1.1 million locations with the "worst"
return on investment. The end of the tail of the long tail.  Rural and
tribal locations which aren't profitable to provide higher speed
broadband.

These locations have very low customer density, and difficult to serve.

After the Sandwich Isles Communications scandal, gold-plated proposals
will be viewed with skepticism.  While a proposal may have a lower total
cost of ownership over decades, the business case is the cheapest for
the first 10 years of subsidies.  [massive over-simplification]

Historically, these projects have lack of timely completion (abandoned,
incomplete), and bad (overly optimistic?) budgeting.



--
Jeff Shultz


Like us on Social Media for News, Promotions, and other information!!

   <https://www.facebook.com/SCTCWEB/>     [image:
https://www.instagram.com/sctc_sctc/]
<https://www.instagram.com/sctc_sctc/>
<https://www.yelp.com/biz/sctc-stayton-3>
<https://www.youtube.com/c/sctcvideos>







**** This message contains confidential information and is intended only
for the individual named. If you are not the named addressee you should not
disseminate, distribute or copy this e-mail. Please notify the sender
immediately by e-mail if you have received this e-mail by mistake and
delete this e-mail from your system. E-mail transmission cannot be
guaranteed to be secure or error-free as information could be intercepted,
corrupted, lost, destroyed, arrive late or incomplete, or contain viruses.
The sender therefore does not accept liability for any errors or omissions
in the contents of this message, which arise as a result of e-mail
transmission. ****


Current thread: