      On Fri, 4 Apr 2003, Daniel Senie wrote:
    > I suspect, though I've never seen it done, that it'd be possible to set up
    > a gas genset with both a pressurized tank of fuel and a connection to the
    > mains, with valves to switch between.

Yes, that's the way it's normally done.  The input at the carburetor is
valved based upon the pressure on the utility-line side.