Why not just use SCH40 PVC sticks? Everywhere stocks that in copious levels. ----- Mike Hammett Intelligent Computing Solutions Midwest Internet Exchange The Brothers WISP ----- Original Message ----- From: "Brandon Martin" <lists.nanog () monmotha net> To: nanog () nanog org Sent: Tuesday, November 28, 2023 9:27:58 AM Subject: Re: Outside plant - prewire customer demarc preference On 11/27/23 18:52, owen--- via NANOG wrote:
Why would 1” be significantly harder to get than 3/4”? Both in EMT and PVC, it’s readily available to the best of my knowledge.
Most residential electrical contractors are going to use rated ENT since it's what they can easily get at a normal supply house or even home center. This is the stuff made popular by Carlon in their trademark blue that makes people call it "smurf tube". It's readily available in 1/2" and 3/4" everywhere from home centers to basically any supply house. 1" is less common - most home centers don't have it, and since it isn't normally needed in residential nor is ENT basically ever used in commercial, neither do a lot of strictly electrical supply houses. You can of course get corrugated communication duct in that size, often with mule tape pre-installed as a bonus, but a lot of electrical supply houses that deal only in "electrical" and not "communications" don't have that and will send folks to a "low voltage communication supplier" or have to special order it. A lot of electrical contractors, especially residential, would rather not bother with a separate supply run, and having to wait is a pain if it wasn't planned early on and also often means you're paying freight separately. Even then, most of the folks going to a communications supplier are going to reach straight for 1.25" or larger in commercial since you don't have to worry about drilling studs. As I recall, my local communication cable house didn't even have 1" in stock, but they did have 1.25" in stock, and their price was basically the same as the 1" as a result. So it's not that it doesn't exist or anything, it's just that, at least as far as I've seen, there's not a ton of demand for it, so local stock is thin. All that said, I just checked Home Depot, and they are showing some stock on 1" ENT at my local store, so maybe that's changing. Used to be they only stocked 3/4" and 1/2". They still only have 25ft hanks of the 1" stuff (you can get 1/2" and 3/4" in 25 or 100-200ft), but at least they have it now. It is still about 4x the price of 3/4" per unit length, though. -- Brandon Martin
Current thread:
- Re: Outside plant - prewire customer demarc preference, (continued)
- Re: Outside plant - prewire customer demarc preference Sean Donelan (Nov 22)
- Re: Outside plant - prewire customer demarc preference Christopher Hawker (Nov 22)
- Re: Outside plant - prewire customer demarc preference Sean Donelan (Nov 24)
- Re: Outside plant - prewire customer demarc preference Brandon Martin (Nov 23)
- Re: Outside plant - prewire customer demarc preference Sean Donelan (Nov 24)
- Re: Outside plant - prewire customer demarc preference Josh Luthman (Nov 27)
- Re: Outside plant - prewire customer demarc preference Brandon Martin (Nov 27)
- Re: Outside plant - prewire customer demarc preference Andy Ringsmuth (Nov 27)
- Re: Outside plant - prewire customer demarc preference owen--- via NANOG (Nov 27)
- Re: Outside plant - prewire customer demarc preference Brandon Martin (Nov 28)
- Re: Outside plant - prewire customer demarc preference Mike Hammett (Nov 28)
- Re: Outside plant - prewire customer demarc preference Brandon Martin (Nov 30)
- Re: Outside plant - prewire customer demarc preference Owen DeLong via NANOG (Nov 28)
- Re: Outside plant - prewire customer demarc preference Brandon Martin (Nov 30)
- Re: Outside plant - prewire customer demarc preference owen--- via NANOG (Nov 30)
- Re: Outside plant - prewire customer demarc preference Gary Buhrmaster (Nov 30)
- Re: Outside plant - prewire customer demarc preference Sean Donelan (Nov 30)
- Re: Outside plant - prewire customer demarc preference Andy Ringsmuth (Nov 28)
- Re: Outside plant - prewire customer demarc preference Sean Donelan (Nov 28)
- Re: Outside plant - prewire customer demarc preference Stan Barber (Nov 28)
- Re: Outside plant - prewire customer demarc preference Sean Donelan (Nov 28)