On 2/9/19 1:20 PM, Miles Fidelman wrote:
Though... getting power to the switches might be an issue, less so if you're deploying on power poles.
Just because you're on the power poles doesn't mean you can easily get permission or space to mount powered equipment on them let alone power at reasonable costs.
In areas with a commercial for-profit monopoly electric utility, just getting attachment space in the telecom zone at a reasonable price can be a big issue, and often putting stuff outside the telecom cable attachment zone is impossible.
-- Brandon Martin
Current thread:
- Re: Last Mile Design, (continued)
- Re: Last Mile Design Ben Cannon (Feb 08)
- Re: Last Mile Design Baldur Norddahl (Feb 09)
- Re: Last Mile Design Ben Cannon (Feb 09)
- Re: Last Mile Design Mark Tinka (Feb 09)
- Re: Last Mile Design Mikael Abrahamsson (Feb 09)
- Re: Last Mile Design Miles Fidelman (Feb 09)
- Re: Last Mile Design Mike Hammett (Feb 09)
- Re: Last Mile Design Miles Fidelman (Feb 09)
- Re: Last Mile Design Mike Hammett (Feb 09)
- Re: Last Mile Design Miles Fidelman (Feb 09)
- Re: Last Mile Design Brandon Martin (Feb 09)
- Re: Last Mile Design Baldur Norddahl (Feb 09)
- Re: Last Mile Design Thomas Bellman (Feb 09)
- Re: Last Mile Design Miles Fidelman (Feb 09)
- Re: Last Mile Design Baldur Norddahl (Feb 09)
- RE: Last Mile Design Tony Wicks (Feb 09)
- RE: Last Mile Design Mikael Abrahamsson (Feb 10)
- Re: Last Mile Design Mark Tinka (Feb 10)
- Re: Last Mile Design Mikael Abrahamsson (Feb 10)
- Re: Last Mile Design Mark Tinka (Feb 10)
- Re: Last Mile Design Baldur Norddahl (Feb 10)