nanog mailing list archives
Re: OT: Below grade fiber interconnect points
From: Gary Buhrmaster <gary.buhrmaster () gmail com>
Date: Fri, 15 Nov 2013 21:45:07 +0000
On Fri, Nov 15, 2013 at 9:25 PM, Jay Ashworth <jra () baylink com> wrote: ...
Yeah; cranes are a bitch. :-)
No, it is arranging for a rigging crew and the safety plan reviews for the lift (at least in any major company/institution which wants to stay on the happy side of OSHA; and has consul that suggests that the risks of not following the process is likely a CEE). Gary
Current thread:
- Re: OT: Below grade fiber interconnect points, (continued)
- Re: OT: Below grade fiber interconnect points Justin M. Streiner (Nov 13)
- Re: OT: Below grade fiber interconnect points Thomas (Nov 14)
- RE: OT: Below grade fiber interconnect points Sam Roche (Nov 14)
- RE: OT: Below grade fiber interconnect points Joe McLeod (Nov 14)
- Re: OT: Below grade fiber interconnect points Shawn L (Nov 14)
- Re: OT: Below grade fiber interconnect points William Allen Simpson (Nov 14)
- Re: OT: Below grade fiber interconnect points Michael Sinatra (Nov 15)
- Re: OT: Below grade fiber interconnect points Jay Ashworth (Nov 15)
- Re: OT: Below grade fiber interconnect points Michael Sinatra (Nov 15)
- Re: OT: Below grade fiber interconnect points Jay Ashworth (Nov 15)
- Re: OT: Below grade fiber interconnect points Gary Buhrmaster (Nov 15)
- Re: OT: Below grade fiber interconnect points Michael Sinatra (Nov 15)
- Re: OT: Below grade fiber interconnect points Jay Ashworth (Nov 15)