Re: Looking for advice on datacenter electrical/generator
From: Richard Welty <rwelty () averillpark net>
Date: Wed, 2 Apr 2003 18:43:09 -0500 (EST)
On Wed, 2 Apr 2003 15:37:28 -0800 Dan Lockwood <dlockwood () coe shastalink k12 ca us> wrote:
Our current plan is to purchase the UPS with a minimal amount of battery, approximately 15min worth; just enough to get the generator running. Is this the better way to go? Or should we consider more battery?
just how certain are you that your generator is always going to start within 15 minutes? richard -- Richard Welty rwelty () averillpark net Averill Park Networking 518-573-7592 Unix, Linux, IP Network Engineering, Security
Current thread:
- Looking for advice on datacenter electrical/generator Dan Lockwood (Apr 02)
- Re: Looking for advice on datacenter electrical/generator Richard Welty (Apr 02)
- Re: Looking for advice on datacenter electrical/generator Alex Rubenstein (Apr 02)
- Re: Looking for advice on datacenter electrical/generator Gary E. Miller (Apr 02)
- Re: Looking for advice on datacenter electrical/generator Alex Rubenstein (Apr 02)
- Re: Looking for advice on datacenter electrical/generator Dan Armstrong (Apr 02)
- Re: Looking for advice on datacenter electrical/generator David Lesher (Apr 04)
- Re: Looking for advice on datacenter electrical/generator Bill Woodcock (Apr 04)
- RE: Looking for advice on datacenter electrical/generator Matthew Kaufman (Apr 04)
- RE: Looking for advice on datacenter electrical/generator Bill Woodcock (Apr 04)
- RE: Looking for advice on datacenter electrical/generator Matthew Kaufman (Apr 04)
- RE: Looking for advice on datacenter electrical/generator Bill Woodcock (Apr 04)
- Re: Looking for advice on datacenter electrical/generator Alex Rubenstein (Apr 02)
- Re: Looking for advice on datacenter electrical/generator Richard Welty (Apr 02)