Re: Final transition steps
From: net99 () net99 net
Date: Sun, 16 Apr 1995 15:59:05 -0700 (MST)
(To get the ICM DS3 up and running on time for the 21st (instead of before the 30th) we have some timing issues that are pretty critical, namely provisioning the DS3 and installing all the equipment. It is unclear that this is possible on the MFS side (never mind the paperwork process, which we probably will just have to ignore in the short run). What is clear though is that current connectivity to MAE-EAST is insufficient for making 21 April a happy day --
I seriously doubt this will be a problem if you push. We had a T3 installed for Internet World In San Jose with 3 days notice. MFS & PacBell were both very cooperative. This move up date concerns us a lot, too. We're still waiting for MAE-west to come online completely to complete our west coast peering arrangements, and hoping to get connectivity to fix-west/sprint along the way soon as well. Dave -- Dave Siegel, Director of Engineering Network (99) Operations Center (800)638-9947 (602)249-1190 after hours dsiegel () net99 net
Current thread:
- Final transition steps Elise Gerich (Apr 14)
- Re: Final transition steps jeff (Apr 17)
- Re: Final transition steps Elise Gerich (Apr 18)
- <Possible follow-ups>
- Re: Final transition steps Sean Doran (Apr 14)
- Re: Final transition steps net99 (Apr 16)
- Re: Final transition steps Elise Gerich (Apr 17)
- Re: Final transition steps Elise Gerich (Apr 17)
- Re: Final transition steps Elise Gerich (Apr 17)
- Re: Final transition steps Ross Veach (Apr 18)
- Re: Final transition steps Elise Gerich (Apr 18)
- Re: Final transition steps jeff (Apr 17)