nanog mailing list archives
Re: Equinix Chicago Power Outage
From: Richard A Steenbergen <ras () e-gerbil net>
Date: Sat, 25 Jun 2005 04:22:25 -0400
On Sat, Jun 25, 2005 at 12:37:00AM -0700, Wayne E. Bouchard wrote:
Word is that they went back to utility power about 30 minutes ago and they're declaring the emergency over.
Now begins the fun process of pulling all the gear that got fried during the power surges. :) For a good link on the incident: http://www.belleville.com/mld/belleville/news/local/11981877.htm -- Richard A Steenbergen <ras () e-gerbil net> http://www.e-gerbil.net/ras GPG Key ID: 0xF8B12CBC (7535 7F59 8204 ED1F CC1C 53AF 4C41 5ECA F8B1 2CBC)
Current thread:
- Equinix Chicago Power Outage Malayter, Christopher (Jun 24)
- <Possible follow-ups>
- RE: Equinix Chicago Power Outage Joel Perez (Jun 24)
- Re: Equinix Chicago Power Outage Wayne E. Bouchard (Jun 25)
- Re: Equinix Chicago Power Outage Richard A Steenbergen (Jun 25)
- Re: Equinix Chicago Power Outage Deepak Jain (Jun 27)
- Re: Equinix Chicago Power Outage Wayne E. Bouchard (Jun 25)