One planned for Egypt-France is 8 pair, each pair doing 128 lambdas
at 10Gbit per lambda.  Do the math.

That's a lot of retards

And they dont have to upgrade the fiber in order to upgrade the
bandwidth. They use the same fiber and just swap out the lasers on
either side

Within limits - the replacement laser has to be something that works with
the regen units located every 30 to 50 miles or so along the cable (incidentally,
getting power to a regen unit that's 1,500 miles down the cable and under 4
miles of water is non-trivial - the usual solution for that is to pump a
high-voltage feed down a copper conductor in the cable.  Only one conductor
is needed, because salt water makes a *very* good ground. ;)

_______________________________________________
Full-Disclosure - We believe in it.
Charter: http://lists.grok.org.uk/full-disclosure-charter.html
Hosted and sponsored by Secunia - http://secunia.com/


Current thread: